Vertical formwork design: Dimensioning and Minimum Demoulding Times
Diseño de encofrados verticales: dimensionado y tiempos mínimos de desencofrado
dc.creator | Teixeira, Sofía | |
dc.creator | Santilli, Adrián | |
dc.creator | Puente, Iñigo | |
dc.date | 2015-11-02 | |
dc.identifier | http://revistas.um.edu.uy/index.php/ingenieria/article/view/338 | |
dc.description | The design of vertical formworks depends on the maximum lateral pressure exerted by fresh concrete for dimensioning the panels and the time needed for use it. In this work, the experimental models to predict the maximum lateral pressure exerted by the self-compacting concrete (SCC) on vertical formwork are described. On the other hand, the minimum demoulding times proposed by different normatives and different researches in the literature are described. Finally, a formwork removal method based on the ASTM 403 standard is developed and experimental tests were carried out in Uruguay for the validation of the presented method. | en-US |
dc.description | El diseño de encofrados verticales depende de la predicción de la máxima presión lateral ejercida por el hormigón en estado fresco para el dimensionado de los paneles y del tiempo necesario de utilización de los mismos. En este trabajo se describen los modelos experimentales descritos en la bibliografía para predecir la máxima presión lateral ejercida por el hormigón autocompactante (HAC) en encofrados verticales y los tiempos de desencofrados propuestos por las diferentes normativas y los distintos autores en la literatura. Finalmente, se presenta un método de desencofrado desarrollado en base a la norma ASTM 1074 y la campaña experimental realizada en una de las hormigoneras más grandes de Uruguay para la validación de dicho método. | es-ES |
dc.format | application/pdf | |
dc.language | spa | |
dc.publisher | Universidad de Montevideo | es-ES |
dc.relation | http://revistas.um.edu.uy/index.php/ingenieria/article/view/338/408 | |
dc.rights | Derechos de autor 2019 Sofía Teixeira, Adrián Santilli, Iñigo Puente | es-ES |
dc.rights | http://creativecommons.org/licenses/by/4.0 | es-ES |
dc.source | Memoria Investigaciones en Ingeniería; No. 13 (2015); 7-16 | en-US |
dc.source | Memoria Investigaciones en Ingeniería; Núm. 13 (2015); 7-16 | es-ES |
dc.source | Memoria Investigaciones en Ingenieria; n. 13 (2015); 7-16 | pt-BR |
dc.source | 2301-1106 | |
dc.source | 2301-1092 | |
dc.subject | Hormigón autocompactante (HAC) | es-ES |
dc.subject | Encofrados verticales | es-ES |
dc.subject | Presión lateral | es-ES |
dc.subject | Tiempos mínimos de desencofrado | es-ES |
dc.subject | Self-compacting concrete (SCC) | en-US |
dc.subject | Vertical formwork | en-US |
dc.subject | Lateral pressure | en-US |
dc.subject | Minimum demoulding times | en-US |
dc.title | Vertical formwork design: Dimensioning and Minimum Demoulding Times | en-US |
dc.title | Diseño de encofrados verticales: dimensionado y tiempos mínimos de desencofrado | es-ES |
dc.type | info:eu-repo/semantics/article | |
dc.type | info:eu-repo/semantics/publishedVersion | |
dc.type | Peer reviewed articles | en-US |
dc.type | Artículos evaluados por pares | es-ES |
dc.type | Artigos revistos por pares | pt-BR |
Files in this item
Files | Size | Format | View |
---|---|---|---|
There are no files associated with this item. |